• #349/100, BRS Nagar, J Block, Ludhiana 141012
  • info.maasarchitects@gmail.com

+919673317266

Welcome to MAAS Architects

We are Unique and client is our strong focus.

We are an architectural design firm based out from Ludhiana, Punjab. Providing complete Architectural, Interior design and Project Management services for residential, commercial, hospitality design and institutional projects. We create thoughtful, well-crafted contemporary and modern architectural designs inspired by our client, best suited to their requirements with a vision of desire to design, our approach is to investigate the specific nature of each project to craft an innovative design response to meet the aspirations of our client.

Request best Quote: info.maasarchitects@gmail.com

OUR BEST SERVICES

Awesome Image

Architectural Planning

Every Project is planned and designed with a concept inspired by the client requirements, developed into detailed/working layouts(Architecture) with separate deck of structural(Civil), electrical and plumbing drawings(MEP).

Awesome Image

Interior Design Consultancy

We design the interiors with a vision and a theme specific to the project, while respecting the functionalism and aesthetics of the space We assist client, with the material(lighting, furniture, flooring, finishes, hardware etc.) selection, material calculations and high level estimates.

Awesome Image

Project Management Consultancy

We assist clients in developing the comprehensive project schedules with regular updates post monitoring of activities as anticipated at project sites.

Latest Projects

  • View All (9)
  • Exteriors (05)
  • Interiors (04)
Awesome Image

Residential

Exterior

Awesome Image

Residential

Exterior

Awesome Image

Residential

Exterior

Awesome Image

Residential

Exterior

Awesome Image

Hospital

Exterior

Awesome Image

Retail

Interior

Awesome Image

Puja Room

Interior

Awesome Image

Bed Room

Interior

Awesome Image

Reception

Interior

Being the best at what we do, you can work with us from anywhere!

Our Working Process

We have distilled our Architectural and Interior design process into 4 steps, which are described underneath:

1

Pre-Design Phase

Understanding and formulation of Client requirements, Concept development, Strategic planning, Form-Function-Aesthetics Factors.

2

Design Phase

Preparation of Tender, GFC drawings, Design detailing for ease of construction at site, Preparation of Structure drawings, MEP drawings.

3

Execution/Construction Phase

Technical drawings, regular monitoring and coordination with the site team to achieve the timely milestones and maintaining the highest level of quality work at all the times.

4

Post Construction Phase

Necessary documentation, Preparation of As-Built drawings, handing over deck.

FOUNDER’S EXPERIENCE

KNOWLEDGE CENTRE

Awesome Image

Importance of laying DPC during construction

The DPC or Damp Proof Course is used to restrict the effect of water rising from the substructure ground to the superstructure level of the building, A DPC layer is usually laid below all masonry walls, regardless if the wall is a load bearing wall or a partition wall. DPC is laid both horizontally and vertically as per the construction details.

Awesome Image

Pre Construction Termite Treatment

As per the Bureau of Indian Standard, chemicals that are recommended include Clorpyrifos 20% E.C, Lindane 20% E.C; Imidacloprid 30.5% SC for Termite Pest Control For the new construction. The emulsion is prepared out of these chemicals by mixing them with water at the prescribed dosages. The stages and sequence for treatment are: Bottom and Sides of Trenches of Foundation, Backfill in Immediate Contact with Foundation; Junction of Wall and Floor, Top Surface of Plinth Filling, External Perimeter of Building.

Awesome Image

Steps to apply PU

  • Step 1 : Ensure the personal safety equipments are in place.

  • Step 2: Start with the sanding process with 180 No. Sandpaper and Clean the dust.
  • Step 3: mix the Sealer Base:Hardner:Thinner with 80:20:30 ratio.
  • Step 4: Apply 2-3 coats of sealer mixture and let it dry for 8-12 hours in between each coat, and do not exceed 72 hours of drying time, also the first coat of sealer should be more diluted than second coat, this ensures better grain filling.
  • Step 5: Again sand the surface with 320 No. sandpaper, once the surface is dry.
  • Step 6: Mix the PU with Topcoat:Hardner:Thinner in the ratio 80:20:30.
  • Step 7: Apply 2-3 coats of mixture and let it dry for 8-12 hours in between each coat, if required sand the surface in between with sandpaper 320 No.
  • Step 8: Buffing can be done as well, but ensure to apply final coat of topcoat after buffing.
  • "The above steps are in reference to application of PU for Asian Paints, the same could vary with different brands".